SEWERAGE & DRAINAGE

Telemetry for sewage and storm water pumping stations

Wet-well levels, pump status, run hours and faults from every SPS and drainage pumping station, with overflow and flood events logged against rainfall.

Overview

Unmanned stations, accountable operation

Sewage and drainage pumping stations are spread across a city and often visited only when something has failed. A blocked pump or a power trip is discovered when the wet well overflows into a street or a drain.

Nebulotix RTUs monitor wet-well level, pump status and power at each station, raise alarms before overflow, and record every event. Drainage stations are linked to rain gauge data so performance during storms can be reviewed against the design.

Scope

What is supplied

01

Station RTU

Monitors level, pump run/trip status, power supply and door access, with optional remote start/stop.

02

Wet-well level

Ultrasonic or radar level sensor with independent float switch backup for high-high alarm.

03

Pump monitoring

Run hours, starts, current and fault status per pump.

04

Rain gauges

Tipping-bucket gauges in the drainage catchment, linked to storm pumping station records.

05

Control Centre

City-wide map of stations, alarms, run-hour reports and event history.

Typical technical configuration
ItemTypical configurationNotes
Level sensingUltrasonic / radarFloat switch backup for HH alarm
Pump inputsRun, trip, auto/manual, currentPer pump
PowerMains with battery backupReports power failure
Rain gaugeTipping bucket, 0.2 or 0.5 mmLinked to catchment stations
Communication4G with SMS fallbackAlarms delivered without internet
IntegrationModbus · MQTTExisting PLC panels where present

Typical values. Final selection follows site survey, hydraulic review and the project specification.

Functions

Functions

Early overflow warning

High-level alarms with time to spill based on inflow rate.

Pump health

Run hours, start counts and current trends to plan maintenance before failure.

Power monitoring

Grid and DG status, phase loss and voltage alarms.

Flood event logs

Level, pumping and rainfall recorded together for each storm.

Operator accountability

Site visits and manual operations time-stamped.

Compliance reporting

Monthly availability and incident reports for the ULB or board.

How we deliver

Survey, supply, operate

  1. Survey and design

    Hydraulic review, instrument and valve placement, radio coverage study.

  2. Supply and install

    Field equipment installed, commissioned and tagged on GIS.

  3. Operate and maintain

    Remote monitoring, preventive maintenance and operator training through O&M.

FAQ
Can telemetry be added to existing SPS panels?

Yes. The RTU reads pump status from auxiliary contacts or the existing PLC, and adds its own level sensor and power monitoring where needed.

How are alarms delivered?

By SMS, app notification and email, with escalation to a second contact if an alarm is not acknowledged.

Is rainfall data needed for storm pumping stations?

It is strongly recommended. Without rainfall, it is not possible to tell whether flooding came from a storm beyond design or from a station that did not perform.